Prof. Dr. Olga Papathanasiou
photovoltaic-technology expert

References Photovoltaic-Technology-Consultancy

  • 2013 Due diligence, portfolio 2 x 20 MWp PV power plant, Arequipa, Peru.
  • 2013 Due diligence, portfolio 2 x 10 MWp PV power plant, South Africa.
  • 2013 Due diligence, portfolio 25 MWp PV power plant, Kazanlak, Bulgaria.
  • 2013 Due diligence, portfolio 35 MWp PV power plant, Ashalim, Israel.
  • 2013 Due diligence, portfolio 55 MWp PV power plant, UK.
  • 2013 Audit, c-Si line Shangrao, China.
  • 2013 Audit, c-Si line Baoding, China.
  • 2013 Audit, c-Si line Changzhou, China.
  • 2013 Audit, c-Si line Qidong, China.
  • 2013 Due diligence, portfolio of two 10.5 MWp PV power plants in the Western Cape Province South Africa.
  • 2013 Due diligence, portfolio of two 100 MWp and 50 MWp PV power plants in East Copiapo, Atacama Region, Chile.
  • 2012 Technology assessment, LCPV c-Si based module technology.
  • 2012 Due diligence, portfolio 24 MWp PV power plant, Rajasthan, India.
  • 2012 Due diligence, portfolio 27 MWp PV power plant, Kathu, South Africa.
  • 2012 Audit, c-Si line Shangrao, China.
  • 2012 Due diligence, portfolio 85.5 MWp PV power plants, Matzikama, Reddersburg, Valleydora, Glen Thorne, Storm, South Africa.
  • 2012 Technology assessment, temperature behavior and long-time degradation of CdTe thin-film module technology.
  • 2012 Due diligence, portfolio 45 MWp PV power plant, Giurgiu, Romania.
  • 2012 Audit, c-Si line Korea.
  • 2012 Due diligence, portfolio 10 MWp PV power plant, Brakpoort, South Africa.
  • 2012 Audit, c-Si line Yangzhou, China.
  • 2012 Audit, c-Si line Qidong, China.
  • 2012 Due diligence, portfolio 30 MWp PV power plant, Schutsekama, South Africa.
  • 2012 Due diligence, portfolio 10.8 MWp PV power plant, Mivtachim, Israel.
  • 2011 Bankability report, innovative CIGS thin-film module technology
  • 2011 Due diligence, a-Si/µc-Si production line, Russia
  • 2011 Due diligence, a-Si production line, Spain
  • 2011 Due diligence, PV module manufacturer, Ukraine
  • 2011 Due diligence, PV module manufacturer, China
  • 2011 Technology assessment, comparison a-Si, CIGS and CdTe PV technologies
  • 2011 Due diligence, portfolio 24.09 MWp, Colleferro, Castel Volturno, San Tamaro, Italy
  • 2011 Due diligence, portfolio 14.08 MWp, 16.8 MWp, Silistra, Bulgaria
  • 2011 Due diligence, portfolio 14.08 MWp, Marche, Italy
  • 2011 Due diligence, portfolio 20 MWp, Italy
  • 2011 Due diligence, portfolio 5.2 MWp, Basilikata, Italy
  • 2010 - 2011 Due diligence, portfolio 39.2 MWp, Puglia, Italy
  • 2010 - 2011 Due diligence, portfolio 50 - 60 MWp, Czech Republic
  • 2010 Due diligence, portfolio 70 MWp, Rovigo, Italy
  • 2010 Due diligence, portfolio 40 MWp, Canada
  • 2010 Due diligence, Investionsbank R&D project
  • 2010 Due diligence, innovative silicon manufacturing process
  • 2010 Study, state-of-the-art thin-film photovoltaics
  • 2010 Study, United Kingdom’s renewable energy incentive program
NB Projects were executed as freelancer with direct clients and subcontracted.

Several articles for "PHOTON International, The Photovoltaic Magazine" among them:

  • A good day for Ms. Schönefeld-Schnuck PI 5/2009 page 44 (pdf)
  • A declaration of war from Switzerland PI 8/2008 page 50 (pdf)
  • Razor thin and efficient PI 5/2009 page 154 (pdf)
  • Q-Cells: Only four horses left in the race PI 01/2009 page 114 (pdf)
  • Solyndra: Pushing innovation at any price PI 01/2009 page 120 (pdf)
  • AVA Solar: Cadmium telluride modules just like First Solar ? only cheaper PI 01/2009 page 128 (pdf)
  • Looking for Second Solar PI 12/2008 (website)
  • Toward Cd-free CIS modules PI 10/2008 page 68 (pdf)
  • The first 20-percent thin-film cell PI 10/2008 page 66 (pdf)
  • Sun over scorched earth PI 5/2008 page 56 (pdf)
  • Market survey on solar simulators PI 6/2009 page 172
  • Market survey on climatic chambers PI 5/2009 page 164
  • Market survey on conductive layers and sputter targets PI 3/2009 page 134
  • Market survey on glass washers PI 2/2009 page 118
  • Market survey on silicon absorber deposition systems PI 11/2008 page 160
  • Market survey on laser scribers PI 8/2008 page 258
  • Market survey on laminators PI 8/2008 page 222
  • Market survey on solar simulators PI 6/2008 page 186
  • Market survey on climatic chambers PI 5/2008 page 126
  • Market survey on TCO deposition systems PI 3/2008 page 120
  • Market survey on glass washers PI 2/2008 page 116
  • Market survey on wet etching equipment PI 12/2007 page 128